【24h】

Prioritised Dynamic Communicating Processes: Part Ⅱ

机译:优先的动态通信过程:第二部分

获取原文
获取原文并翻译 | 示例

摘要

This paper illustrates the work presented in 'Part Ⅰ', giving additional examples of use of channel-types, extended rendezvous and FORKs that lean towards real applications. Also presented are a number of other additions and extensions to the OC-cam language that correct, tidy up or complete facilities that have long existed. These include fixing the PRI ALT bug, allowing an unconditional SKIP guard as the last in a PRI ALT, replicator STEP sizes, run-time computed PAR replication counts, RESULT parameters and abbreviations, nested PROTOCOL definitions, inline array constructors and parallel recursion.
机译:本文说明了“第一部分”中介绍的工作,并给出了一些更倾向于实际应用的通道类型,扩展会合点和FORK的使用示例。还介绍了OC-cam语言的许多其他添加和扩展,可以纠正,整理或完善早已存在的设施。其中包括修复PRI ALT错误,允许无条件的SKIP保护作为PRI ALT中的最后一个,复制器STEP大小,运行时计算的PAR复制计数,RESULT参数和缩写,嵌套的PROTOCOL定义,内联数组构造函数和并行递归。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号