首页> 外文会议>25th World Energy Engineering Congress (WEEC), null >PERFORMANCE CONTRACTING-TIPS To GET WHAT You NEED, AND AVOID WHAT You DONT
【24h】

PERFORMANCE CONTRACTING-TIPS To GET WHAT You NEED, AND AVOID WHAT You DONT

机译:绩效合同提示可获取您需要的内容,并避免您不知道的内容

获取原文
获取原文并翻译 | 示例

摘要

Performance contracting promises great things with little apparent risk to a host facility. Typically, there is no upfront expense involved to the facility, and payments usually start only when the project is complete and energy savings should already be accruing. However, despite the typically intense attorney reviews and resulting reams of contractual legalese, there are significant risks inherent in this form of procurement. And the risks are on both sides of the table - both performance contractor and facility face hazards. While most of these risks could be mitigated through proper negotiation and preparation, most are not because they are not considered sufficiently early in the process, if at all. For instance, what is the risk of spending too much, and of receiving too little, both in goods and savings, for your facility? How can you compare vastly different proposals from vendors of wildly different capabilities? What is the risk to your facility if a project significantly under performs? Measurement and verification procedures are by necessity fuzzy and ill defined and yet part of the price premium you are paying is for M&V and the contractor's underwriting of this risk. If you are sure the savings are there, why pay for that underwriting?
机译:绩效承包承诺对伟大的事情,对宿主设施几乎没有明显的风险。通常,设施不涉及前期费用,付款通常仅在项目完成且应该已经节省能源时才开始。但是,尽管通常会进行严格的律师审查并产生大量的合同法令,但这种形式的采购仍存在很大的固有风险。风险摆在桌子的两边-承包商和设施都面临着危险。尽管可以通过适当的谈判和准备来减轻这些风险中的大多数,但绝不是因为没有考虑到在过程中足够早就考虑到这些风险。例如,为您的设施在商品和储蓄上花费过多而接受过少的风险是什么?您如何比较功能迥异的供应商提供的完全不同的提案?如果一个项目的执行不力会给您的设施带来什么风险?度量和验证程序必然模糊且定义不清,但是您要支付的部分价格溢价是为了M&V和承包商对此风险的承保。如果您确定有节余,为什么要为此承保付款呢?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号