IS COMMISSIONING ONCE ENOUGH?

机译:调试是否足够?

获取原文
获取原文并翻译 | 示例

摘要

The Energy Systems Laboratory has developed a commissioning process called Continuous Commissioning~(SM) over the last decade. This process is used to resolve operating problems, improve comfort, optimize energy use, and sometimes to recommend retrofits. The process has produced average energy savings of about 20% without significant capital investment in well over 100 large buildings in which it has been implemented. Payback has virtually always been under 3 years with most at two years or less. This paper describes the process and presents recent evidence of the need for follow-up commissioning when indicated by consumption increases. A case study is presented that specifically shows the value of this follow-up.
机译:能源系统实验室在过去的十年中开发了一种称为“连续调试”(SM)的调试过程。此过程用于解决操作问题,提高舒适度,优化能源使用,有时还建议进行改造。在实施了100多个大型建筑物的过程中,该过程平均节省了约20%的能源,而无需大量投资。投资回收期实际上一直不到3年,最多不到两年。本文描述了该过程,并提出了当消耗量增加时需要进行后续调试的最新证据。提出了一个案例研究,具体显示了此随访的价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号