Rehabilitation of the Historic Elm Street Truss Bridge Using an Innovative Disassembly Construction Technique

机译:使用创新的拆装施工技术修复历史悠久的榆树街桁架桥

获取原文
获取原文并翻译 | 示例

摘要

This project consisted of an innovative construction technique for the rehabilitation of the Elm Street Bridge over the South Branch of the Raritan River in Neshanic Station, Somerset County, NJ. The two span lenticular truss was constructed in 1896 and is listed on the National and State Registers of Historic Places. Due to excessive deterioration of the truss, the County awarded a rehabilitation contract in April 2006. The original plan called for the members to be rehabilitated in-place by cleaning, painting and repairing the deteriorated steel. A value-engineered alternative was proposed to dismantle the truss, repair and paint in the shop, and reassemble. This would allow a more thorough repair done under controlled shop conditions, decrease the construction time and eliminate costly field painting. The proposed plan utilized an Acrow prefabricated bridge to support the truss during dismantling and reassembly. Load testing confirmed the truss was carrying load as predicted. The bridge was opened to traffic in August 2007.
机译:该项目包括一项创新的施工技术,用于修复新泽西州萨默塞特郡Neshanic站拉里坦河南支上的榆树街大桥。两个跨距的双凸透镜桁架建于1896年,并列在国家和州历史名胜古迹中。由于桁架的过度损坏,该郡于2006年4月签订了修复合同。最初的计划要求通过清洁,喷漆和修复损坏的钢材就地修复这些构件。提出了一种价值工程的替代方案,以拆除桁架,修理和油漆车间,然后重新组装。这样可以在受控的车间条件下进行更彻底的维修,减少施工时间并消除昂贵的现场喷漆。拟议的计划利用Acrow预制桥在拆卸和重新组装时支撑桁架。载荷测试证实了桁架正按预期承受载荷。该桥于2007年8月通车。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号