【24h】

Wet Gas Allocation on the Canyon Express Project

机译:Canyon Express项目的湿气分配

获取原文
获取原文并翻译 | 示例

摘要

In September 2002, production from the three fields that together form the Canyon Express Project - King's Peak, Aconcagua, and Camden Hills - was begun. Drilled in record water depths of 2000 to 2200 meters in the Eastern Gulf of Mexico, each of the nine wells was connected to one of two 12-inch pipelines carrying the commingled wet gas back to the Canyon Station platform for processing, a distance of 91 kilometers away in Main Pass block 261. rnDual-differential wet gas meters were chosen for the task of allocating gas and liquid back to individual wells. Because the gas from all three fields is relatively "dry" (Lockhart-Martinelli parameter < 0.01, GVF > 99%) and because the operating pressures are quite high (~ 250 bar), this was an area of application in which these devices had heretofore not been applied. rnThe use of these meters on the nine wells making up the Canyon Express Project is reviewed and discussed in detail. Their unusual performance is explained, and the route to an acceptable overall measurement experience is explored, including the manner in which successful allocation was achieved. Finally, several important lessons that were learned during the course of the project are presented.
机译:2002年9月,开始了三个共同构成峡谷特快专案的区域的生产-国王山峰,阿空加瓜和卡姆登山丘。在墨西哥东部湾2000到2200米的创纪录水深中钻探,这9口井中的每口井都连接到两条12英寸管线中的一条,将混合的湿气运回峡谷站平台进行处理,距离为91在主通道块261中相距1000公里的地方。选择了双差湿式气表,用于将气体和液体分配回各个井。由于来自所有三个气田的气体都是相对“干燥”的(Lockhart-Martinelli参数<0.01,GVF> 99%),并且由于工作压力很高(〜250 bar),因此这些设备具有以下应用领域:迄今为止尚未应用。 rn审查并详细讨论了在构成Canyon Express项目的9口井中使用这些仪表的情况。解释了它们的非凡性能,并探索了获得可接受的总体测量体验的途径,包括成功分配的方式。最后,介绍了在项目过程中吸取的一些重要教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号