Temporary diversion channels are conventionally lined with riprap, especially if high flow velocities are expected. Due to the confined space and concerns about leakage, LDPE (Low Density Polyethylene Geomembrane) lined temporary diversion channels were designed and constructed for a hydropower dam decommissioning project on Vancouver Island. The constructed trapezoidal channels ranged in size from 1 m to 4 m bottom widths, 1.5 m to 4.5 m depths, with slopes of 2% to 25%. Flow velocities of up to 7 m/s were estimated, with depths of flow varying from 1 m to 2.5 m. Each channel contained a right angle bend, which was constructed with a riprap splash pad. Allowances were provided for superelevation, due to gradual bends, and cross waves. Flared inlets were required to accelerate the flow into the channel, and plunge pool outlets were required, to dissipate the energy from the high velocity flows. Two channels were constructed and then removed after the former hydropower diversion dam was decommissioned, removed and the river bed reconstructed. The author is not aware of any other LDPE lined channels of this size or with these high velocities having been designed or constructed. These lined channels have a wide range of applications for clean and contaminated water management.
机译:临时分流通道通常使用riprap衬里,特别是在期望高流速的情况下。由于空间有限以及对泄漏的担忧,低密度聚乙烯土工膜衬砌的LDPE临时导流通道是为温哥华岛水电大坝退役项目设计和建造的。建造的梯形通道的尺寸范围为底部宽度1 m至4 m,深度1.5 m至4.5 m,坡度为2%至25%。估计流速高达7 m / s,流动深度从1 m到2.5 m不等。每个通道都包含一个直角弯头,该弯头由riprap防溅垫构成。由于逐渐弯曲和横波,为超高提供了余量。需要扩口的入口以加速流向通道的流动,而需要切入池的出口以消散高速流动的能量。在前水电站导流大坝退役,拆除并重建河床之后,建造了两个通道,然后拆除。作者不知道有其他任何这种大小的LDPE衬里通道,或者已经设计或建造了这些高速通道。这些衬里通道在清洁和受污染的水管理中具有广泛的应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号