Subsurface Utility Engineering A Technology – Driven Process that Results in Increased Safety, Fewer Claims and Lower Costs

机译:地下公用事业工程一种技术驱动的过程,可提高安全性,减少索赔并降低成本

获取原文
获取原文并翻译 | 示例

摘要

A lack of reliable information on the location of underground utilities can result in costly conflicts, damages,rndelays, service disruptions, redesigns, claims, and even injuries and lost lives during construction activities.rnWhile the location of subsurface utilities might be found on plans and records, experience has often shownrnthat the utility locations are not exactly as recorded or the records do not fully account for the buried utilityrnsystems. This may be especially true of our nation’s aged roadway infrastructure. An engineering processrnknown as Subsurface Utility Engineering (SUE) has proven to be a welcome solution to providing this muchneededrnutility information. Combining geophysics, surveying, civil engineering, and nondestructivernexcavation technologies, SUE can provide accurate mapping of existing underground utilities in threerndimensions during the construction phase to avoid unnecessary utility related downtime, eliminaternunexpected conflicts with utilities, and enhance safety during construction. The use of SUE services hasrnbecome a routine requirement on highway and bridge design projects, and is strongly advocated by thernFederal Highway Administration and State Departments of Transportation. Studies by these agencies andrnmajor utility companies have confirmed a significant return on investment, ranging from an average of $3 torn$18 for every $1 spent on SUE services. Similar economic benefits, in addition to increased safety to workersrnand the public, are available to those involved with roadway or other construction projects that mayrnencounter subsurface utilities.
机译:缺乏关于地下公用设施位置的可靠信息可能会导致代价高昂的冲突,破坏,延误,服务中断,重新设计,索赔,甚至在施工活动中受伤甚至丧生。记录中,经验经常表明公用设施的位置与记录的位置不完全相同,或者记录未完全说明掩埋的公用设施系统。对于我们国家老化的道路基础设施而言,尤其如此。事实证明,一种名为Suburity Utility Engineering(SUE)的工程流程是提供这种急需的营养信息的受欢迎的解决方案。 SUE结合了地球物理,测量,土木工程和非破坏性开挖技术,可以在施工阶段在三个维度上对现有地下公用设施进行准确的制图,从而避免了与公用事业有关的不必要的停机时间,消除了与公用事业的意外冲突,并提高了施工期间的安全性。 SUE服务的使用已成为公路和桥梁设计项目的常规要求,并得到联邦公路管理局和国家交通运输部的大力提倡。这些机构和大型公用事业公司的研究已经证实了可观的投资回报,在SUE服务上每花费1美元,平均可获得3至18美元的折磨。涉及道路或其他可能遇到地下公用事业的建筑项目的人,除了可以提高对工人和公众的安全性外,还可以获得类似的经济利益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号