When a hydro power producer wants to plan the production for the next day in an optimal way a precise and detailed model is needed. But when using this model to plan for a longer period of time the computational complexity increases. To overcome this problem there is a need to do a model reduction of the original system into a smaller equivalent system with almost the same properties. This paper compares the performance and computation time of different setups in the equivalent representation of the original hydro power system. This includes different setups in both topology and the piecewise linear production equivalents. It is tested independently on two rivers with 21 and 28 stations respectively and also for the case if both of these rivers were to represented by one equivalent system. The performance is evaluated with respect to error in production and computation time. It is shown that with model reduction the relative error lies between 11.5 and 5.1 percent of installed capacity and the computation time is then reduced by 99.3 and 92.5 percent respectively.
机译:当水力发电商想要以最佳方式计划第二天的生产时,需要精确而详细的模型。但是,当使用此模型计划更长的时间时,计算复杂性会增加。为了克服这个问题,需要将原始系统模型简化为具有几乎相同特性的较小等效系统。本文以原始水力发电系统的等效表示形式比较了不同设置的性能和计算时间。这包括拓扑结构和分段线性生产等效项中的不同设置。它分别在两条分别拥有21个站和28个站的河流上进行了独立测试,并且也针对这两个河流都由一个等效系统表示的情况进行了测试。针对生产和计算时间的误差评估性能。结果表明,通过模型简化,相对误差在装机容量的11.5%和5.1%之间,计算时间分别减少了99.3%和92.5%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号