【24h】

Hybrid power station act based on run off river

机译:基于径流的混合电站行动

获取原文
获取原文并翻译 | 示例

摘要

The greatest challenge that can be faced by power system designers is the setup process of power systems in critical sites. In the paper, a new kind of system models based a unique methodology is proposed. The proposed idea is identified by creating what is called “Human Made Waterfall System”. The waterfall is the phenomenon that allows the water to be streaming down from highest places. This idea was proposed in order to be applied on a specific critical site in Iraq identified by Altun-Kopru town due to the impairment the lead the proposed location to satisfy waterfall phenomenon concept and due to the necessity for electricity in some of the residential villages. The water of the river that streams throughout Altun-Kopru is proposed to be passed through a water channel in order to be falling on a “run olì river” hydro turbine allocated in the proposed village. In addition, the hydro turbine considerations were studied, to exhibit the impact of such considerations on both a hydro turbine model individually and on a hybrid system identified by hydro and solar system. Finally, a novel tank control system is designed in order to dominate water flow ratio by retaining tank water in a highest level.
机译:电力系统设计人员可能面临的最大挑战是关键站点中电力系统的设置过程。本文提出了一种基于独特方法论的新型系统模型。通过创建所谓的“人为瀑布系统”来识别提出的想法。瀑布是使水从最高处流下的现象。提出此想法是为了将其应用于伊拉克的一个由Altun-Kopru镇确定的特定关键地点,因为该地点受到损害,导致建议的地点满足瀑布现象的概念,并且由于某些居民村的用电需求。建议流经整个阿尔通-科普鲁(Altun-Kopru)的河水,使其流经水道,以使其落在建议村庄分配的“游河”水轮机上。此外,还研究了水轮机考虑因素,以展示这些因素对单独的水轮机模型以及由水电和太阳能系统确定的混合动力系统的影响。最后,设计了一种新颖的水箱控制系统,以通过将水箱中的水保持在最高水位来控制水流比。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号