Study on capacity calculation of traction substations LRT (Light Rail Transit) Palembang Sumatera Selatan

机译:牵引变电站LRT(轻轨)Palembang Sumatera Selatan的容量计算研究

获取原文
获取原文并翻译 | 示例

摘要

South Sumatera Palembang Light Rail Transit or abbreviated LRT Palembang is a type of mass transit system that was built to connect between Sultan Mahmud ßadaruddin II International Airport with Jakabaring Sports Complex. LRT Palembang system will be supplied by traction substations installed along the route. Therefore, an analysis and design is done to determine the power capacity and number of traction substations that will be used. Principally, the way to determine amount and capacity of traction substration including the analysis and design amount of trainset, the speed and operational time of the system, the force acting on the trainset, the trainset power capacity, the substation's location, the voltage drop and the power capacity of the traction substation.
机译:南苏门答腊巨港轻轨交通或简称LRT巨港是一种公共交通系统,旨在连接苏丹MahmudßadaruddinII国际机场与Jakabaring运动场馆之间。 LRT Palembang系统将由沿路线安装的牵引变电站提供。因此,需要进行分析和设计以确定将使用的功率容量和牵引变电站的数量。主要是确定牵引力替代量和容量的方法,包括列车组的分析和设计量,系统的速度和运行时间,作用在列车上的力,列车组的功率,变电站的位置,电压降和牵引变电站的功率容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号