Study on capacity calculation of traction substations LRT (Light Rail Transit) Palembang Sumatera Selatan

机译:牵引变电站能力计算研究LRT(轻轨电路)Palembang Sumatera Selatan

获取原文

摘要

South Sumatera Palembang Light Rail Transit or abbreviated LRT Palembang is a type of mass transit system that was built to connect between Sultan Mahmud ?adaruddin II International Airport with Jakabaring Sports Complex. LRT Palembang system will be supplied by traction substations installed along the route. Therefore, an analysis and design is done to determine the power capacity and number of traction substations that will be used. Principally, the way to determine amount and capacity of traction substration including the analysis and design amount of trainset, the speed and operational time of the system, the force acting on the trainset, the trainset power capacity, the substation's location, the voltage drop and the power capacity of the traction substation.
机译:South Sumatera Palembang轻轨传输或缩写LRT Palembang是一种批量交通系统,建立在苏丹Mahmud之间的建造,与Jakabaring Sports Complex有关苏格兰人II国际机场。 LRT Palembang系统将由沿途安装的牵引变电站提供。因此,完成分析和设计以确定将使用的功率容量和牵引变电站的数量。主要是,确定牵引基块的量和容量的方法,包括Trainset的分析和设计量,系统的速度和运行时间,作用在Trainset上的力,Trainset电力容量,变电站的位置,电压下降和牵引变电站的功率容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号