首页> 外文会议>2014 IEEE International Conference on System Science ang Engineering >Robust stage plan for a railway marshalling station
【24h】

Robust stage plan for a railway marshalling station

机译:铁路编组站的稳健阶段计划

获取原文
获取原文并翻译 | 示例

摘要

In order to reduce the average dwell time of the railcars at railway marshalling stations, previous studies on stage plan are almost exclusively based on the assumptions of accurate and unchanged input data. However, delays in rail freight transport are common. The occurrences of these unpredictable disturbances are unavoidable to lead to the stage plan should be rescheduled. In this paper, we firstly present a robust model for the stage plan based on minimal perturbation in dynamic cumulative scheduling theory with lexicographic multi-objective, such that robustness is considered as the primary objective and the benefits of railway marshalling stations is the secondary one. Then, a hybrid multi-point constructive search algorithm is designed to solve the model iteratively. Experimental results show that the hybrid algorithm and minimal perturbation in dynamic cumulative scheduling theory approaches could be a promising way to improve the stage plans' robustness.
机译:为了减少铁路编组站有轨电车的平均停留时间,以前对舞台计划的研究几乎完全是基于准确和不变的输入数据的假设。但是,铁路货运的延误很普遍。这些不可预测的干扰的发生不可避免地导致应重新安排阶段计划。在本文中,我们首先提出了一种基于字典累积多目标的动态累积调度理论中基于最小扰动的阶段计划的鲁棒模型,以鲁棒性为主要目标,铁路编组站的收益为次要目标。然后,设计了一种混合的多点构造搜索算法来迭代求解模型。实验结果表明,动态累积调度理论方法中的混合算法和最小扰动可能是提高阶段计划鲁棒性的一种有前途的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号