首页> 外文会议>2013 IEEE Grenoble Power Tech >Converter placement in the interconnection of railway power grid and public power grid based on cost-reliability approach
【24h】

Converter placement in the interconnection of railway power grid and public power grid based on cost-reliability approach

机译:基于成本可靠度方法的铁路电网与公共电网互联互感器布置

获取原文
获取原文并翻译 | 示例

摘要

The railway load in Switzerland is expected to increase in the next years. Increasing the capacity of the interconnection between the railway power system and the public grid is a reasonable solution to deal with this problem. This paper proposes a way to find the locations and capacities for new interconnections and the capacity expansion for the existing one. To show the effectiveness of the proposed model, the networks in the Suisse Romande region (French part of Switzerland) is considered as a case study.
机译:预计瑞士的铁路负荷将在未来几年增加。提高铁路系统与公共电网之间的互连能力是解决此问题的合理解决方案。本文提出了一种方法来查找新互连的位置和容量,以及现有互连的容量扩展。为了证明所提出模型的有效性,我们以Suisse Romande地区(瑞士的法国部分)的网络为例进行了研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号