首页> 外文会议>2012 Winter Simulation Conference : WSC Goes Europe. >Scheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing
【24h】

Scheduling jobs with time constraints between consecutive process steps in semiconductor manufacturing

机译:在半导体制造的连续工艺步骤之间按时间限制安排作业

获取原文
获取原文并翻译 | 示例

摘要

In this paper, we consider flow shop scheduling problems for jobs with time constraints between consecutive process steps. We start by analyzing different types of time constraints that arise in semiconductor wafer fabrication facilities. A simple heuristic that sequentially schedules the jobs in a list scheduling manner is proposed. Moreover, a decomposition approach based on mixed integer programming is developed. The two approaches are compared by means of randomly generated problem instances.
机译:在本文中,我们考虑了连续流程步骤之间具有时间限制的作业的流水车间调度问题。我们首先分析半导体晶圆制造设备中出现的不同类型的时间限制。提出了一种简单的启发式方法,以列表调度的方式依次调度作业。此外,开发了一种基于混合整数规划的分解方法。通过随机生成的问题实例比较这两种方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号