首页> 外文会议>2012 Third International Conference on Digital Manufacturing and Automation >Study on Risk Evaluation for Logistics Park Construction Project Based on Fuzzy Comprehensive Evaluation Model
【24h】

Study on Risk Evaluation for Logistics Park Construction Project Based on Fuzzy Comprehensive Evaluation Model

机译:基于模糊综合评价模型的物流园区建设项目风险评价研究

获取原文
获取原文并翻译 | 示例

摘要

Logistics park construction is a high risk activity for its large investment, long payback period, influenced by many factors. It will result in a great loss that are difficult to restore in a wide range and in a long time to enterprise and society once failure decision. How to properly identify and evaluate the risks of logistics park construction project and manage them has become an important issue. The paper establishes an index system on risk evaluation for construction project of logistics park based on HHM-WBS, presents fuzzy comprehensive evaluation model and evaluates the risk of Polymerization logistics park in Shijiazhuang city using the model. Case shows the effectiveness and feasibility of the method.
机译:物流园区建设是一项高风险活动,因为其投资大,投资回收期长,受多种因素影响。一旦失败决定,将造成巨大的损失,难以对企业和社会造成大范围的损失,并且难以长期恢复。如何正确识别和评估物流园区建设项目的风险并进行管理已成为重要问题。建立了基于HHM-WBS的物流园区建设项目风险评价指标体系,提出了模糊综合评价模型,并利用该模型对石家庄市聚合物流园区风险进行了评价。实例说明了该方法的有效性和可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号