首页> 外文会议>2012 International Conference on Connected Vehicles and Expo >Analysis on Actual Capacity of Long Tunnel by Using Greenshields Model
【24h】

Analysis on Actual Capacity of Long Tunnel by Using Greenshields Model

机译:基于Greenshields模型的长隧道实际承载力分析

获取原文
获取原文并翻译 | 示例

摘要

Using Metro Count 5600, the speed and headway data of vehicles are collected at different sections of No. 3 Qing ling Tunnel, e.g. at the entrance, inside and at the exit. Based on the real surveyed data, the most commonly used linear expression model, Greenshields, is taken to fit them. According to the fitted curve, we obtain the change patterns of the three fundamental characteristics of traffic flow. The results show that the instantaneous speed is generally lower than 80 km/h at the entrance. As the drivers adapt to the tunnel environment, the speed becomes higher inside the tunnels. At the exits, most of vehicles accelerate. Our analysis of the headway indicates that the capacity inside the tunnel is lower than that of the entrances or the exits, which should be caused by the closed environment there. Therefore, for a whole tunnel, the capacity inside is used as the recommended value as the tunnel's capacity. We conclude this paper by recommending different capacity values at each section for the further research.
机译:使用Metro Count 5600,在青岭3号隧道的不同路段(例如,北半球)收集车辆的速度和车头数据。在入口处,内部和出口处。根据实际的调查数据,采用最常用的线性表达式模型Greenshields进行拟合。根据拟合曲线,我们得到了交通流三个基本特征的变化规律。结果表明,入口处的瞬时速度通常低于80 km / h。随着驾驶员适应隧道环境,隧道内部的速度变得更高。在出口处,大多数车辆都在加速。我们对行进距离的分析表明,隧道内部的通行能力低于入口或出口的通行能力,这可能是由于隧道内的封闭环境所致。因此,对于整个隧道,将内部容量用作隧道容量的建议值。我们通过在每个部分推荐不同的容量值来进行进一步的研究来结束本文。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号