首页> 外文会议>2012 IEEE International Conference on Condition Monitoring and Diagnosis. >An approach of generator coherency for underfrequency load shedding and islanding mechanism: Study on Sulawesi Selatan-Tenggara-Barat (Sulselrabar) System, Sulawesi, Indonesia
【24h】

An approach of generator coherency for underfrequency load shedding and islanding mechanism: Study on Sulawesi Selatan-Tenggara-Barat (Sulselrabar) System, Sulawesi, Indonesia

机译:发电机相干性用于低频减载和孤岛机制的一种方法:印度尼西亚苏拉威西岛的东南-东南-苏拉威西(Sulselrabar)系统研究

获取原文
获取原文并翻译 | 示例

摘要

In power system operation, frequency issue caused by power imbalance between generation and load can be happened in power system. If generation is smaller than load, system frequency will drop. When generation deficiency is too large, system frequency will decrease significantly which can lead to system blackout. To solve this frequency issue, proper under-frequency load shedding and also islanding scheme is essential to prevent continuous decreasing of system frequency. In this paper, conventional under-frequency load shedding and islanding scheme based on generator coherency is designed for Sulawesi Selatan-Tenggara-Barat (Sulselrabar) system, one of power system in Sulawesi, Indonesia. Sulselrabar system isn't too large with peak load of about 800 MW therefore application of conventional under-frequency load shedding and islanding scheme is adequate. All simulations in this paper were performed using DIgSILENT Power Factory.
机译:在电力系统运行中,电力系统可能会发生由发电和负荷之间的电力不平衡引起的频率问题。如果发电量小于负载,系统频率将下降。当发电不足太大时,系统频率将大大降低,这可能导致系统停电。为了解决该频率问题,适当的低频负载削减和孤岛方案对于防止系统频率连续降低至关重要。本文针对印度尼西亚苏拉威西电力系统之一的苏拉威西Selatan-Tenggara-Barat(Sulselrabar)系统设计了基于发电机相干性的常规低频减载和孤岛方案。 Sulselrabar系统不太大,峰值负载约为800 MW,因此应用常规的低频减载和孤岛方案已足够。本文中的所有仿真均使用DIgSILENT Power Factory进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号