This paper evaluates a system or system component, by manual or automated means to verify that the system satisfies specified set of requirements. The Test Management and Control involves three major activities; test planning, test execution and defect management which needs to be planned and monitored in a structured manner to ensure delivery of quality product adhering to all project timelines. The purpose of this document is to present the methods, procedures, and approach to be used in the verification and validation for Test Management & Control. It consists of important activities like defining all the testing methodologies in detail for the test planning and lay down a process and procedure so that test plan will reflect all the activities which are going to get executed during the execution phase. The Test execution phase is the actual verification phase where you need to monitor the test case execution closely, and make sure that you are well within the defined Upper Control Limit (UCL) and Lower Control Limit (LCL). During the test execution phase which is clearly planned during the test planning phase, any deviation from these UCL & LCL requires a revised plan so that the deliverables are not going to jeopardy. So once we have clearly defined all the rules of the game during the planning phase and work on the same during the execution phase, we can certainly make sure that the product delivered will of high quality product. Managing Defects is also one of the very important phases all along the testing cycle. We need to pay extra attention to the defects getting fixed during the last few days of the testing cycle, so as to maintain the stability of the product. Do not fix the minor defects at the end of the testing cycle, unless they are critical and severe.
机译:本文通过手动或自动方式评估系统或系统组件,以验证系统是否满足指定的一组要求。测试管理和控制涉及三项主要活动:测试计划,测试执行和缺陷管理,需要以结构化的方式进行计划和监视,以确保交付符合所有项目时间表的优质产品。本文档的目的是介绍在“测试管理与控制”的验证和确认中使用的方法,过程和方法。它由重要的活动组成,例如为测试计划详细定义所有测试方法并制定流程和过程,以便测试计划将反映在执行阶段将要执行的所有活动。测试执行阶段是实际的验证阶段,您需要在其中密切监视测试用例的执行情况,并确保您完全处于定义的控制上限(UCL)和控制下限(LCL)之内。在测试计划阶段已明确计划的测试执行阶段中,与这些UCL和LCL的任何偏差都需要修订计划,以使可交付成果不会受到危害。因此,一旦我们在计划阶段明确定义了所有游戏规则,并在执行阶段进行了相同的工作,就可以确定所交付的产品具有高质量的意愿。在整个测试周期中,管理缺陷也是非常重要的阶段之一。我们需要特别注意在测试周期的最后几天内修复的缺陷,以保持产品的稳定性。除非严重和严重,否则请勿在测试周期结束时修复次要缺陷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号