In December 2007, the New York City Metropolitan Transit Authority (MTA)rnawarded a $1.15 billion contract to S3II Tunnel Constructors (a joint venture of J.F.rnShea, Skanska and Schiavone) to extend the No. 7 Subway Line 2.4 km (1.5 miles)rnfrom Times Square to the Jacob E. Javits Convention Center. The two 6.9-meterrn(22.5?foot) diameter tunnels were primarily in rock, except for a 91-meter (300-foot)rnsection where the rock was depressed and the mining operation would encounter arnmixed face condition.rnThe contract required that an appropriate ground improvement method be designedrnand installed for this depression in the rock surface. Ground freezing was selected asrnthe technically superior approach to converting soft, unconsolidated soils to a rock-likernstructurally sound and waterproof material. This project represents the first time thatrnTBMs have mined through artificially frozen ground.rnThe installation of the ground freezing system was completed entirely from thernground surface requiring interaction with city agencies and local businesses. Numerousrnunderground utilities and street intersections also made the installation of more thanrn250 pipes challenging and complex.rnThe paper will describe the design and how factors such as soil properties andrngroundwater flow affect freeze development time. It will also include innovative componentsrnsuch as aluminum pipes and monitoring devices used on this project.
机译:2007年12月,纽约市公交管理局(MTA)向S3II隧道建设商(JFrnShea,Skanska和Schiavone的合资企业)授予了11.5亿美元的合同,以延长地铁7号线的距离,距离该地铁站2.4公里(1.5英里)。时代广场到Jacob E. Javits会议中心。两条直径为6.9米(22.5英尺)的隧道主要位于岩石中,除了91米(300英尺)的断面是岩石被压下并且采矿作业会遇到混杂的工作面的情况。合同要求适当设计并安装了针对岩石表面凹陷的地面改良方法。地面冻结被选为将软质,未固结的土壤转化为类似岩石的结构健全且防水的材料的技术上优越的方法。该项目是TBM首次通过人工冻结的地面进行开采。地面冻结系统的安装完全从地面完成,需要与城市机构和当地企业进行互动。众多地下公用事业和街道交叉口也使250多个管道的安装具有挑战性和复杂性。本文将介绍设计以及土壤特性和地下水流量等因素如何影响冻融时间。它还将包括该项目中使用的创新组件,例如铝管和监控设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号