首页> 外文会议>2010 International conference on construction and project management. >Numerical Analysis of Construction Process for Four-Lane Large Section Highway Tunnel with FEM
【24h】

Numerical Analysis of Construction Process for Four-Lane Large Section Highway Tunnel with FEM

机译:四车道大断面公路隧道有限元施工过程数值分析

获取原文
获取原文并翻译 | 示例

摘要

Against a highway tunnel with four lanes constructed by both side drift method in class II and III surrounding rock, based on FEM, the lining structure and the stability of the surrounding rock are stimulated and analyzed. Research results show that, displacement of surrounding rock in ultra-large span highway tunnel constructed by both side drift method can be controlled effectively and reasonable construction process is obtained.
机译:在有限元分析的基础上,针对基于II类和III类围岩的双向巷道四车道高速公路隧道,对围岩的衬砌结构和稳定性进行了分析。研究结果表明,采用双侧移法施工的超大跨度公路隧道围岩位移可以得到有效控制,并获得合理的施工过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号