首页> 外文会议>2010 9th International Conference on Environment and Electrical Engineering >Impact of new unit installations on power system reliability and ancillary services requirements
【24h】

Impact of new unit installations on power system reliability and ancillary services requirements

机译:新装置的安装对电力系统可靠性和辅助服务要求的影响

获取原文
获取原文并翻译 | 示例

摘要

Installing new power generation unit always effects operation and performance of a power system including balance between load and generation. Consequently, demand for power reserves the power balancing authority has to acquire for keeping the power system in the equilibrium is changing. Restructuring power system in terms of shutting down old generation units, installing new ones or changing operational characteristics of the existing units will result in different needs for the amount and dynamics of power reserves in the respective categories. The paper studies the situation when the portfolio of power generation units is planned to be changed, new units are going to be installed and some old ones shut down. The effect on power system reliability and change in demand for ancillary services (AS) which are needed to meet the reliability standards is analyzed. Power system reliability is expressed in terms of reliability indices as used by the Czech TSO. Two scenarios of future development of power unit portfolio differ in number and capacity of new units. Finally the impact of new units on AS reservation cost is shown and discussed.
机译:安装新的发电装置始终会影响电力系统的运行和性能,包括负载和发电之间的平衡。因此,为了使电力系统保持平衡,电力平衡机构必须获取的电力储备需求正在变化。从关闭旧发电机组,安装新发电机组或更改现有发电机组的运行特性方面对电力系统进行重组,将导致对相应类别中的备用电量和动力的需求不同。本文研究了计划更改发电设备组合,将要安装新设备并关闭一些旧设备的情况。分析了对电力系统可靠性的影响以及满足可靠性标准所需的辅助服务(AS)需求的变化。电力系统可靠性由捷克TSO使用的可靠性指标表示。功率单元产品组合的未来发展的两种情况在新单元的数量和容量方面有所不同。最后,显示并讨论了新单位对AS预订成本的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号