首页> 外文会议>2010 12th International Conference on Computer Modelling and Simulation (UKSim2010) >Competency Based Optimized Assignment of Project Managers to Projects
【24h】

Competency Based Optimized Assignment of Project Managers to Projects

机译:基于能力的项目经理对项目的优化分配

获取原文
获取原文并翻译 | 示例

摘要

An enterpriseȁ9;s productivity is closely correlated with its people and strategies; therefore, a forceful human resource management system and at the front a project manager is the most valuable asset of the current century construction companies. But so far, few methods exist for selecting and assigning effective project manager in the projects. In this paper, a mixed integer programming model for maximizing the project benefit function has been presented; this model shows the optimum allocation of project managers and project vice managers in multi projects based on their competencies. The competency assignment developed based on Project Management knowledge, Project Management performance and Project Management Personal Competencies. In order to modeling the problem, after gathering the projects information, the model has been simulated using CPLEX software with AMPL language. The developed model will allow description of project managers'' competencies and determination of their working hours and positions in each time.
机译:企业9的生产率与其人员和策略密切相关;因此,强大的人力资源管理系统以及最前面的项目经理是当前世纪建筑公司最宝贵的资产。但是到目前为止,在项目中很少有选择和分配有效项目经理的方法。本文提出了一种最大化项目效益函数的混合整数规划模型。该模型显示了基于胜任力的多个项目中项目经理和项目副经理的最佳分配。能力分配是基于项目管理知识,项目管理绩效和项目管理个人能力而制定的。为了对问题进行建模,在收集项目信息之后,已使用带有AMPL语言的CPLEX软件对模型进行了仿真。开发的模型将允许描述项目经理的能力,并确定他们每次的工作时间和职位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号