首页> 外文会议>2007 SPE Digital Energy Conference and Exhibition >New Methodology for AFE Estimate and Risk Assessment: Reducing Drilling Risk in an Iranian Onshore Field
【24h】

New Methodology for AFE Estimate and Risk Assessment: Reducing Drilling Risk in an Iranian Onshore Field

机译:AFE估算和风险评估的新方法:降低伊朗陆上油田的钻井风险

获取原文
获取原文并翻译 | 示例

摘要

Because of inherent uncertainties in drilling, evaluation and estimation of well drilling time and cost are preferred to be done on the basis of probabilistic methods. The purpose of this paper is to present a new methodology for developing an AFE generating model, using a specific Iranian onshore oil field development case study to illustrate the technique. The model utilizes risk analysis and incorporates Monte Carlo simulation in conjunction with statistical analysis of historical drilling data to generate more accurate risked AFE estimates. In addition to general methodology, ROWC (rate of well completion) is introduced. The results of interpretation and statistical analysis are presented as well.
机译:由于钻井过程中存在固有的不确定性,因此最好在概率方法的基础上进行钻井时间和成本的评估和估算。本文的目的是提供一个开发AFE生成模型的新方法,并使用一个特定的伊朗陆上油田开发案例研究来说明该技术。该模型利用风险分析,并结合了蒙特卡洛模拟和历史钻探数据的统计分析,以生成更准确的风险AFE估计值。除一般方法外,还介绍了ROWC(完井率)。还介绍了解释和统计分析的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号