【24h】

Re-escalation Cycles in Large Scale Government Information Systems

机译:大型政府信息系统中的重新升级周期

获取原文
获取原文并翻译 | 示例

摘要

Government agencies and private sector businesses have spent billions of dollars on failed large-scale system implementations. Many of these projects escalated beyond original budget and schedule constraints before being terminated. In some cases, due to business or operational requirements, these projects begin again, only to re-escalate. This study examined this cycle via the Tax Systems Modernization (TSM) project at the Internal Revenue Service (IRS) to learn about the processes that lead to re-escalation cycles in large-scale IT projects. Based on our analysis, we believe that external agencies may play a role in both escalation and de-escalation based on the nature of their respective recommendations. Escalation may also he influenced by an inability on the part of management to adequately set priorities or feedback controls stemming from an additional lack of overall strategy, Finally, our research supports previous ideas that administrative turnover, cost awareness, and external shocks may be lead catalysts for beginning a period of de-escalation.
机译:政府机构和私营部门企业已经在大规模失败的系统实施上花费了数十亿美元。这些项目中有许多在终止之前都超出了最初的预算和进度限制。在某些情况下,由于业务或运营要求,这些项目会重新开始,只是重新升级。这项研究通过美国国税局(IRS)的税收系统现代化(TSM)项目检查了这个周期,以了解导致大规模IT项目重新升级的过程。根据我们的分析,我们认为,外部机构可能会根据其各自建议的性质在升级和降级中发挥作用。升级也可能受到管理层无法适当设置优先级或由于缺乏整体战略而导致的反馈控制的影响。最后,我们的研究支持以前的观点,即行政更替,成本意识和外部冲击可能是主要催化剂开始一段时期的降级。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号