首页> 外文会议>2001 conference of Waste Management (WM);Annual Waste Management Symposium >PETRO BOND? OIL SOLIDIFICATION POLYMER: HELPING TO SOLVE OIL WASTEPROBLEMS IN THE DOE COMPLEX
【24h】

PETRO BOND? OIL SOLIDIFICATION POLYMER: HELPING TO SOLVE OIL WASTEPROBLEMS IN THE DOE COMPLEX

机译:彼得·邦德油脂固化聚合物:帮助解决DOE复杂物中的油脂问题

获取原文

摘要

The DOE Office of Science and Technology, Deactivation and Decommissioning Focus Area issponsoring a Large-Scale Demonstration and Deployment Project (LSDDP) at the DOE’s MiamisburgEnvironmental Management Project (MEMP), commonly known as the Mound Site. The goals of theLSDDP are to:1. Demonstrate existing developed technologies that are unproven and/or unknown with respect totritium Decontamination and Decommissioning (D&D) applications2. Determine whether the technologies are superior, in safety and/or cost, to current “baseline”technologies, and3. Communicate the demonstration results in such a manner that potential end users of thedemonstrated technologies can easily decide whether or not to adopt these as “baseline” tools forperforming future D&D work.This third objective is the focus of this paper, using the results of the PetroBond? demonstration.Substituting an innovative technology that is a safer, cheaper, faster, or better alternative into a baselineproject is not only a prudent idea but also something that DOE sites will surely embrace in order toreduce cost and schedule.The LSDDP at Mound has demonstrated two technologies for solidifying fluids/sludges:(1) WaterWorks Crystals, to solidify water-based fluids, and (2) Nochar N-990 PetroBond? tosolidify oils and oil-based fluids, such that the solidified materials meet the waste acceptance criteria atthe final disposal facilities. In the LSDDP, both WaterWorks Crystals? and Nochar? PetroBond?completed bench scale tests and full-scale demonstrations and are being deployed for operational use atMound. The project focus has now become to accomplish additional deployments at DOE sites thathave immediate need for treatment and disposal of waste oils and aqueous fluids/sludges.It is the intent of this project to obtain descriptions and characterization profiles of the sludge or wastestream to be treated at each site, then to evaluate the target solution to confirm applicability to thetechnology already demonstrated at Mound. After evaluation, the project will assist the site in the firstapplication of the technology, at a bench scale and then in full scale, in order to provide at least onedrum of successfully solidified waste. The end product of these deployments is characterization data anda summary of conclusions on the sludges that will inform other facilities of the safety and viability of theproduct. This paper will discuss primarily the oil solidification deployments.
机译:美国能源部科学技术,停用和退役重点领域办公室在美国能源部的迈阿密斯堡环境管理项目(MEMP)(通常被称为土墩场)上赞助了一个大规模的示范和部署项目(LSDDP)。 LSDDP的目标是:1.。展示在tri净化和退役(D&D)应用方面未经验证和/或未知的现有开发技术2。确定这些技术在安全性和/或成本方面是否优于当前的“基准”技术,以及3。以这种方式交流演示结果,以使所演示技术的潜在最终用户可以轻松地决定是否将其用作执行未来D&D工作的“基准”工具。第三个目标是本文的重点,使用PetroBond的结果?将更安全,更便宜,更快或更佳的替代技术替代到基线项目中不仅是一个审慎的主意,而且DOE站点肯定会采用某些创新技术以降低成本和进度.Mound的LSDDP展示了两个用于固化流体/污泥的技术:(1)WaterWorks Crystals,用于固化水基流体,以及(2)Nochar N-990 PetroBond?固化油和油基流体,以使固化的材料在最终处置设施中符合废物接收标准。在LSDDP中,两个WaterWorks Crystals?和诺查尔? PetroBond已完成台架试验和全面演示,并已部署在Mound投入运营。该项目现在的重点是在迫切需要处理和处置废油和水性流体/污泥的DOE站点上完成其他部署。本项目的目的是获得要处理的污泥或废物流的描述和特性描述在每个站点,然后评估目标解决方案,以确认对土墩已经演示的技术的适用性。经过评估后,该项目将在现场先后在试验台规模和全规模范围内协助该技术的首次应用,以至少提供成功固化的废物的原始数据。这些部署的最终产品是特性数据和有关污泥的结论的摘要,这些信息将使其他设施了解该产品的安全性和可行性。本文将主要讨论石油固化的部署。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号