【24h】

PRODUCTION SCHEDULING OF COMPLEX JOBS WITH SIMULATION

机译:复杂作业的生产调度与仿真

获取原文
获取原文并翻译 | 示例

摘要

A simulation approach is presented for planning and scheduling a flow of complex jobs for job shop like production systems. Machines may have their own specific restrictions and properties such as relative production speed, set up characteristics and scheduling rules. A production job consists of a set of tasks represented by a directed activity network in which an activity is defined as a single task to be processed on a machine. As a consequence a machine may also be an assembly station. The task duration may be stochastic having any probability distribution. The task flow and the task selection for scheduling is governed by agents: Each machine group acts as an agent combining tasks and machines. Each task acts as an agent guarding the proper network sequences of its job by determining when it is ready for releasing and, after that, controlling its own scheduling priority. A job acts as an agent repeatedly updating critical path analysis for its tasks. For that purpose a separate critical path simulation model is used. Crucial for the modelling the "process approach" used. The model is generic with respect to job shop configuration e.g. number of machine groups and number of machines per group and also with respect to the job configuration.
机译:提出了一种仿真方法,用于为生产系统(如生产系统)计划和调度复杂作业的流程。机器可能具有自己的特定限制和属性,例如相对生产速度,设置特性和调度规则。生产作业包含一组由定向活动网络表示的任务,其中活动定义为要在计算机上处​​理的单个任务。因此,机器也可以是装配站。任务持续时间可以是随机的,具有任何概率分布。计划的任务流和任务选择由代理程序控制:每个计算机组均充当将任务和计算机组合在一起的代理程序。每个任务都充当代理,通过确定何时准备发布,然后控制自己的调度优先级,来保护其作业的正确网络序列。作业充当代理,反复为其任务更新关键路径分析。为此,使用了单独的关键路径仿真模型。对于建模至关重要的是使用“过程方法”。该模型对于作业车间配置是通用的,例如计算机组的数量和每组中的计算机的数量,以及有关作业配置的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号