首页> 外文会议>16th International Conference on Industrial Engineering and Engineering Management, 2009 (IEamp;EM '09) >Analysis of influencing factors and mechanism for repurchase price in BT project
【24h】

Analysis of influencing factors and mechanism for repurchase price in BT project

机译:BT项目回购价格的影响因素及机理分析

获取原文

摘要

BT model is widely introduced into infrastructure project (IP) in China. The core issue in the operation process of BT project is that the government sector's confirmation of the repurchase price (RP) and payment methods influences the interests of both sides. However, the theoretical studies and relevant legal system on the issues above are relatively insufficient. This paper defines the concepts of BT operation models and repurchase price in BT project, and analyzes the influencing factors, including the methods of investing funds, construction period, engineering change, benchmark interest rate and investment rate of return (IRR), RP payment methods, repurchase period etc. Through the analyzing of their mechanism and example calculation of the repurchase price, this paper comes out a well targeted contract control strategy on the basis of RP control purpose. The results may have a strong guiding significance in theoretical studies and practical operation of BT model's application in China.
机译:BT模式已广泛引入中国的基础设施项目(IP)。英国电信项目运营过程中的核心问题是,政府部门对回购价格(RP)和付款方式的确认会影响双方的利益。但是,对上述问题的理论研究和有关法律制度还相对不足。本文定义了BT项目中BT运营模式和回购价格的概念,并分析了影响因素,包括投资方式,建设期,工程变更,基准利率和投资收益率(IRR),RP支付方式等。通过对回购价格形成机理的分析和对回购价格的计算实例,基于RP控制目的,提出了针对性强的合同控制策略。研究结果对BT模型在中国的应用理论研究和实际操作具有重要的指导意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号