Southern Link Road Construction in Stockholm - Underground Structures

机译:斯德哥尔摩南环线公路建设-地下结构

获取原文
获取原文并翻译 | 示例

摘要

In the southern part of Stockholm a complicated foundation project is in progress. The contractorrnSKANSKA was first on the site and has started the first part of the extension. The first contract, SLrn10, has turned out to be very complicated and challenging from geotechnical point of view. Therncontract comprises a 460 m long underground structure including 40 meters of rock tunnel, a cutrnand cover concrete tunnel and tunnel ramps. Parts of the tunnel are founded on precast concreternpiles and other parts on bedrock. The ramps are founded on steel-core piles anchored into thernbedrock.rnImportant parts of the project are the temporary structures including steel sheet piling, sealing andrninfiltration systems and temporary working roads.rnAn extensive control program is used under the construction phase for monitoring of settlementsrnand ground water table within the working area. The groundwater situation is not to be affected byrnthe construction works and the settlements in the neighborhood must be small. The constructionrnworks are going on close to buildings and heavy traffic, which has a strong influence of the designrnand the construction methods.rnToday, most of the temporary works are performed and the extensive works with the permanentrnconcrete tunnels are in progress.
机译:在斯德哥尔摩南部,一个复杂的基础工程正在进行中。承包商rnSKANSKA最早在现场,并且已开始扩建的第一部分。从岩土技术的角度来看,第一份合同SLrn10变得非常复杂且具有挑战性。该合同包括一个460 m长的地下结构,其中包括40米的岩石隧道,一条割缝覆盖的混凝土隧道和隧道坡道。隧道的一部分建在预制混凝土上,其他部分建在基岩上。坡道以锚固在基岩中的钢芯桩为基础。rn该项目的重要部分是临时结构,包括钢板桩,密封和渗入系统以及临时工作道路。rn在施工阶段使用了广泛的控制程序来监测沉降和地面工作区域内的地下水位。地下水状况不受建筑工程的影响,附近的居民点必须很小。施工正在进行中,靠近建筑物和交通拥挤,这对设计和施工方法有很大的影响。如今,大部分临时工程已经进行,永久性混凝土隧道的广泛工程正在进行中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号