首页> 外文会议>14th International Conference on Electromagnetic Interference amp; Compatibility >Methods to implement qualify the circuit changes on Proto-PCB to reduce the ESD test cycle time
【24h】

Methods to implement qualify the circuit changes on Proto-PCB to reduce the ESD test cycle time

机译:在Proto-PCB上实施和验证电路更改的方法以减少ESD测试周期

获取原文
获取原文并翻译 | 示例

摘要

It's very important to test the changes implemented in the schematics of an existing board before going to the production. For this we will have to implement the circuit changes of the next revision board on the existing prototype or first revision board and we will try to simulate the tests and get good confidence of result before going to production. Most of the times when we implement the changes we see failure scenarios. These failure cases occur based on the way we implement the external changes. Objective of this paper is to give guidelines to implement the circuit level changes in a better way.
机译:在投入生产之前,测试现有电路板原理图中实现的更改非常重要。为此,我们将必须在现有原型或第一个修订板上实施下一个修订板的电路更改,并且我们将尝试模拟测试并在投入生产之前获得良好的结果信心。在大多数情况下,当我们实施更改时,会看到失败的情况。这些失败情况是根据我们实施外部更改的方式而发生的。本文的目的是为以更好的方式实现电路电平变化提供指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号