首页> 外文会议>International Conference on Electromagnetic Interference Compatibility >Methods to implement qualify the circuit changes on Proto-PCB to reduce the ESD test cycle time
【24h】

Methods to implement qualify the circuit changes on Proto-PCB to reduce the ESD test cycle time

机译:实施和限定电路改变ProDO-PCB的方法,以减少ESD测试周期时间

获取原文

摘要

It's very important to test the changes implemented in the schematics of an existing board before going to the production. For this we will have to implement the circuit changes of the next revision board on the existing prototype or first revision board and we will try to simulate the tests and get good confidence of result before going to production. Most of the times when we implement the changes we see failure scenarios. These failure cases occur based on the way we implement the external changes. Objective of this paper is to give guidelines to implement the circuit level changes in a better way.
机译:在进行生产之前测试现有板原理图中实施的变更非常重要。为此,我们必须在现有原型或第一修订板上实施下一个修订板的电路变化,我们将尝试模拟测试,并在向生产之前获得良好的结果。大多数时候我们在实现更改时我们看到了失败方案。这些故障情况会根据我们实现外部更改的方式进行。本文的目的是提供以更好的方式实现电路电平变化的指导方针。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号