Advancing Cut and Cover Tunnelling in Auckland –Experience Gained from New Lynn Rail Trench

机译:推进奥克兰的切挖隧道施工–从新林恩铁路沟渠获得的经验

获取原文
获取原文并翻译 | 示例

摘要

KiwiRail has a goal of signifi cantly improving passenger rail services to west Auckland, as part of itsrnDART (Developing Auckland’s Rail Transport) suite of projects. The New Lynn Rail Trench (NLRT)rnproject was a signifi cant component of this work. The NLRT project facilitates essential doubletrackingrnof the Western Auckland line, and provides a new commuter transportation hub within arnbusy town centre.rnThe 1.5 km stretch of track through the New Lynn town centre has bisected the township for overrn80 years. Double-tracking the line provided the opportunity to grade-separate road and rail, whichrnwould help to re-connect both sides of the township and enhance public amenity and safety.rnKiwiRail employed an Early Contractor Involvement (ECI) procurement model engaging arnconsortium comprising Fletcher Construction, Beca Infrastructure and Synergine to develop arnDesign and Construct solution.rnWith weak soil conditions and high groundwater levels, a diaphragm wall construction method tornform the trench walls was selected as the best solution. Further challenges to construction includedrnworking within a narrow rail corridor constrained by buildings along much of the boundary, andrna requirement to keep the existing line open for rail services. Detailed construction planning wasrnrequired to ensure rail and construction safety in a constrained space whilst building the trenchrnwalls, propping these walls during excavation, and constructing the base slab in the most effi cientrnway possible.rnThis paper will detail the geotechnical conditions and the additional constraints that made thisrnrail trench a challenging structure to design. It will also describe the fi nal design and constructionrnmethodologies that were employed, that allowed very successful completion of the project.rnAdditionally, this paper will review the design and construction lessons applicable to therncurrent Victoria Park Tunnel project, and indeed for all future cut and cover tunnel projects in thernAuckland isthmus.
机译:KiwiRail的目标是显着改善到奥克兰西部地区的客运铁路服务,这是其rnDART(开发奥克兰铁路运输)项目套件的一部分。新林恩铁路海沟(NLRT)项目是这项工作的重要组成部分。 NLRT项目促进了奥克兰西线的重要双轨运输,并在arnbusy镇中心提供了一个新的通勤交通枢纽。整个新林恩镇中心的1.5公里长的轨道将该镇一分为二,已有80多年的历史了。线路的双重跟踪为公路和铁路的坡度分离提供了机会,这将有助于重新连接城镇的两侧并增强公共便利性和安全性。KiwiRail采用了“早期承包商参与”(ECI)采购模型,该方案与包括Fletcher Construction在内的arnconsortium合作,Beca Infrastructure和Synergine共同开发了arnDesign和Construct解决方案。在土壤条件不佳和地下水位较高的情况下,选择一种将沟槽壁撕成墙的隔膜墙施工方法作为最佳解决方案。施工方面的进一步挑战包括在狭窄的铁路走廊内工作,并受到沿边界大部分地区的建筑物的限制,还要求保持现有线路开放以进行铁路服务。要求进行详细的施工计划,以确保在狭窄空间中的铁路和施工安全,同时建造沟渠墙,在开挖过程中支撑这些墙以及以最有效的方式建造基础板。本文将详细介绍岩土条件和附加的限制因素。这条铁路沟渠的设计具有挑战性。它还将描述所采用的最终设计和施工方法,从而使该项目能够非常成功地完成。此外,本文还将回顾适用于现有维多利亚公园隧道项目的设计和施工课程,以及将来所有切入和覆盖的设计和施工方法奥克兰地峡的隧道工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号