首页> 外国专利> Road or railway construction method by digging trench to form tunnel - material excavated from front end of trench is used to cover trench further behind to restore ground to its original level, leaving only small part of trench uncovered

Road or railway construction method by digging trench to form tunnel - material excavated from front end of trench is used to cover trench further behind to restore ground to its original level, leaving only small part of trench uncovered

机译:通过挖沟形成隧道的公路或铁路施工方法-从沟前端挖出的材料用于覆盖沟的更后方,以将地面恢复到原来的水平,仅保留沟的一小部分

摘要

Material excavated from the front end of the trench is used to cover the trench further behind to form the tunnel, whilst essentially restoring the ground height to its original level prior to the road or railway being built. Only a small part of the trench is left uncovered. MECHANICAL ENGINEERING - PREFERRED FEATURES : The tunnel area immediately adjacent to the front end is left open.
机译:从沟槽前端挖出的材料用于覆盖更深的沟槽以形成隧道,同时在将道路或铁路建造之前,将地面高度基本恢复到原来的高度。仅有一小部分沟槽未被覆盖。机械工程-首选功能:紧邻前端的隧道区域保持开放。

著录项

  • 公开/公告号NL1010486C2

    专利类型

  • 公开/公告日1999-07-13

    原文格式PDF

  • 申请/专利权人 VAN HATTUM EN BLANKEVOORT B.V.;

    申请/专利号NL19981010486

  • 发明设计人 GERRIT OUDAKKER;

    申请日1998-11-05

  • 分类号E02D29/045;E01F8/02;E01F1/00;E02F5/12;

  • 国家 NL

  • 入库时间 2022-08-22 02:26:56

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号