首页> 外文期刊>The Indian concrete journal >Construction of cut and cover tunnel using precast slabs - An experience
【24h】

Construction of cut and cover tunnel using precast slabs - An experience

机译:使用预制板建造切割和覆盖隧道-经验

获取原文
获取原文并翻译 | 示例
       

摘要

This paper presents the details of the first Road tunnel construction project in Delhi executed by adopting part precast and part in-situ techniques. Delhi Metro's engineers, who have been involved in the project from planning to completion share their experience. Introduction This is a case study of Northern Access Road connecting Dwarka roundabout near Domestic Airport to New Terminal (Generally known as T3), Indira Gandhi International Airport (IGIA) at Delhi through at grade roads, approach ramps and a 376 m twin-tunnel under the flying path of runway no. 10/28 (Figure 1).
机译:本文介绍了德里的第一个公路隧道建设项目的详细信息,该项目采用了部分预制和部分现场技术来实施。从计划到完成都参与了该项目的德里地铁工程师将分享他们的经验。简介这是一个北部通道的案例研究,该通道将国内机场附近的Dwarka回旋处连接到新航站楼(通常称为T3),德里的英迪拉·甘地国际机场(IGIA),通过平整道路,进场坡道和下方的376 m双隧道第一条跑道的飞行路径10/28(图1)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号