In a 9-day,24-hour-a-day operation,Tidewater Construction Corporation removed,replaced and reopened to traffic the six truss spans of the Coleman Bridge,an engineering feat that became a cover story of Engineering News-Record.This feat was the culmination of 9 years of planning,environmental studies,and design.The background and a description of the project was presented to this Conference in 1994 by George M.Clendenin,Assistant State Structure and Bridge Engineer,(IBC Paper 94-6) at which time bids had been received and work was about to begin.This paper describes the ensuing events from the perspective of both Tidewater Construction (contractor) and Parsons Brinckerhoff Quade & Douglas,Inc.(engineer).The construction phase started with partnering and we are pleased to report that it ended with partnering.
机译:通过每天9天,每天24小时的操作,Tidewater Construction Corporation拆除,更换并重新开放,以运输Coleman桥的六个桁架跨度,这是一项工程壮举,成为了《工程新闻记录》的封面故事。是9年规划,环境研究和设计的高潮。项目背景和项目描述由1994年助理州结构和桥梁工程师George M.Clendenin提交给本会议(IBC 94-6号文件)。本文从Tidewater Construction(承包商)和Parsons Brinckerhoff Quade&Douglas,Inc.(工程师)的角度描述了随后发生的事件。我们很高兴地报告,合作结束了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号