Reactor Structural Mechanics laboratory, Reactor Engineering Research Division Nuclear Power Institute of China P.O.Box 622(207), Chengdu 610041, China;
Reactor Structural Mechanics laboratory, Reactor Engineering Research Division Nuclear Power Institute of China P.O.Box 622(207), Chengdu 610041, China;
Reactor Structural Mechanics laboratory, Reactor Engineering Research Division Nuclear Power Institute of China P.O.Box 622(207), Chengdu 610041, China;
Reactor Structural Mechanics laboratory, Reactor Engineering Research Division Nuclear Power Institute of China P.O.Box 622(207), Chengdu 610041, China;
Reactor Structural Mechanics laboratory, Reactor Engineering Research Division Nuclear Power Institute of China P.O.Box 622(207), Chengdu 610041, China;
seismic qualification test of CRDL; flow-induced vibration test of reactor internals; reactor of qinshan NPP phase Ⅱ;
机译:钠冷却快速反应器的销束芯结构压力注射的金属燃料搬迁实验的设计与验证测试
机译:DCS设计验证平台和主过程协调控制系统验证平台示范快堆研究进展
机译:中国聚变工程试验堆氦冷却固体育种层的初步结构设计和热力学分析
机译:秦山600MWe反应堆结构设计的验证试验。
机译:重构设计模型以进行成分验证,一致性测试和归纳验证。
机译:用于医学情景的新型患者转移装置的结构设计与初步测试
机译:两端轴向滞后阻尼器长支撑的结构设计方法:第2部分通过装载测试设计方法的验证
机译:设计测试的最终报告pR-50和pR-51反应器管道密封测试和反应器管道结构完整性