首页> 外文会议>The 11th Sino-Korea international symposium on internal combustion engine and automotive engineering >An Application of DoE Methodology to Identify the effectiveness of Variables on Engine performance and to Optimize responses through WAVE
【24h】

An Application of DoE Methodology to Identify the effectiveness of Variables on Engine performance and to Optimize responses through WAVE

机译:DoE方法论在确定变量对发动机性能的有效性以及通过WAVE优化响应中的应用

获取原文
获取原文并翻译 | 示例

摘要

Testing engine performance using an engine dynamometer requires high technical researchers and many facilities. Nowadays, different varieties of CAE program are used for identifying the engine performance instead of engine dynamometer test. This is more convenience, as it does not necessitate an abundance of engine dynamometer experiments and, in addition, produces better results. However, CAE programs also contain various variables which can affect engine performance. Those are coupled with each other, thus making it difficult to determine the effectiveness of different variables on engines. DoE (Design of Experiments) methodology is an efficient way to verify the magnitude of effectiveness on engine performance as well as making responses to be optimized at once without trial & error. This study used data from WAVE simulations, which modeled the DOHC SI engine with in-line 4 cylinders at 1500, 3000 and 4500rpm. DoE methodology is designed properly to determine the effectiveness of five variables on power, BSFC, and volumetric efficiency, as well as to find the optimal response conditions at each rpm through a minimized number of experiments. After finishing DoE process, all the results are examined concerning the reliability of test through a verification experiment.
机译:使用发动机测功机测试发动机性能需要高级技术研究人员和许多设施。如今,使用各种CAE程序代替发动机测功机测试来识别发动机性能。这更加方便,因为它不需要进行大量的发动机测功机实验,而且可以产生更好的结果。但是,CAE程序还包含各种可能影响发动机性能的变量。它们相互耦合,因此很难确定发动机上不同变量的有效性。 DoE(实验设计)方法是一种有效的方法,可以验证发动机性能有效性的大小以及立即做出优化响应而无需反复试验。这项研究使用了来自WAVE模拟的数据,该数据对直列4缸1500、3000和4500rpm的DOHC SI发动机进行了建模。正确设计DoE方法可确定五个变量在功率,BSFC和容积效率方面的有效性,并通过最少的实验找到每个rpm的最佳响应条件。完成能源部流程后,将通过验证实验检查所有有关测试可靠性的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号