首页> 外国专利> MULTI-LAYER BRIDGE CONSTRUCTION METHOD AND CONSTRUCTION SUPPORTING SYSTEM

MULTI-LAYER BRIDGE CONSTRUCTION METHOD AND CONSTRUCTION SUPPORTING SYSTEM

机译:多层桥梁施工方法及施工支撑体系

摘要

Disclosed are a multi-layer bridge construction method and construction supporting system. The construction method comprises bottom-layer bridge construction and upper-layer bridge construction, and specifically comprises: laying a bottom-layer bridge system on the top of a first jig frame; arranging a second jig frame on an outer side of a supporting bridge system; erecting a conversion device on the tops of the second jig frame and the supporting bridge system; and laying a top-layer bridge system on the top of the conversion device. The supporting system comprises a first jig frame, a second jig frame and a conversion device, wherein the conversion device is erected on the tops of the second jig frame and the supporting bridge system, and is used for supporting a top-layer bridge system. In the multi-layer bridge construction method and construction supporting system in the present invention, a conversion device is provided to support the laying of a top-layer bridge system, and upper-layer bridge construction does not need to rely on the mounting of web members. The present invention has high construction efficiency, can be applied to the construction of various types of bridges, and has a wide application range.
机译:本发明公开了一种多层桥梁施工方法和施工支撑系统。该施工方法包括底层桥梁施工和上层桥梁施工,具体包括:在第一胎架顶部铺设底层桥梁系统;在支撑桥系统的外侧布置第二胎架;在第二胎架和支撑桥系统的顶部安装转换装置;以及在转换装置顶部铺设顶层桥接系统。支撑系统包括第一胎架、第二胎架和转换装置,其中转换装置安装在第二胎架和支撑桥系统的顶部,用于支撑顶层桥系统。在本发明的多层桥梁施工方法和施工支撑系统中,提供了一种转换装置来支持顶层桥梁系统的铺设,上层桥梁施工不需要依赖于腹板构件的安装。本发明施工效率高,可应用于各种类型桥梁的施工,应用范围广。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号