首页> 外国专利> A FRAMEWORK TO OPTIMIZE THE SELECTION OF PROJECTS AND THE ALLOCATION OF RESOURCES WITHIN A STRUCTURED BUSINESS ORGANIZATION UNDER TIME, RESOURCE AND BUDGET CONSTRAINTS

A FRAMEWORK TO OPTIMIZE THE SELECTION OF PROJECTS AND THE ALLOCATION OF RESOURCES WITHIN A STRUCTURED BUSINESS ORGANIZATION UNDER TIME, RESOURCE AND BUDGET CONSTRAINTS

机译:在时间、资源和预算约束下,在结构化商业组织内优化项目选择和资源分配的框架

摘要

Aspects of this disclosure are provided for efficiently allocating resources to projects in a schedule under time, resource and budget constraints. In some embodiments, a method is provided. The method accesses a variable for determining efficient allocation of resources in a schedule, including a set of project dependent values indicating which projects in the plurality of projects should be completed as a requirement for completing other projects in the plurality of projects. may include the step of The method also includes determining, based on the set of project dependency values, a dependency path representing an order of projects to be completed, wherein a project in the dependency path can be started until all previous projects in the dependency path are completed. determining the dependent path, which is absent; and determining an efficient selection of a project to be completed based on the dependent path and limited by the budget expenditure within a timeline that maximizes the optimization goal.
机译:本发明的各个方面用于在时间、资源和预算约束下,在时间表中有效地将资源分配给项目。在一些实施例中,提供了一种方法。该方法访问用于确定时间表中资源的有效分配的变量,该变量包括一组项目相关值,该值指示作为完成多个项目中的其他项目的要求,应完成多个项目中的哪些项目。可以包括该方法的步骤还包括基于该组项目依赖值确定表示要完成的项目顺序的依赖路径,其中依赖路径中的项目可以开始,直到依赖路径中的所有先前项目都完成为止。确定不存在的依赖路径;以及在最大化优化目标的时间线内,基于依赖路径并受预算支出限制,确定要完成的项目的有效选择。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号