首页> 外国专利> A FRAMEWORK TO OPTIMIZE THE SELECTION OF PROJECTS AND THE ALLOCATION OF RESOURCES WITHIN A STRUCTURED BUSINESS ORGANIZATION UNDER TIME RESOURCE AND BUDGET CONSTRAINTS

A FRAMEWORK TO OPTIMIZE THE SELECTION OF PROJECTS AND THE ALLOCATION OF RESOURCES WITHIN A STRUCTURED BUSINESS ORGANIZATION UNDER TIME RESOURCE AND BUDGET CONSTRAINTS

机译:在时间和预算约束下优化结构化业务组织中的项目选择和资源分配的框架

摘要

Aspects of the present disclosure are provided for efficiently allocating resources to projects in a schedule under time, resource and budget constraints. In some embodiments, a method is provided. The method includes accessing a variable for determining an efficient allocation of resources in a schedule, including a set of project dependent values indicating which project in a plurality of projects should be completed as a requirement to complete another project in a plurality of projects . The method also includes determining a dependent path that represents an order of projects to be completed based on the set of project dependent values, wherein the project in the dependent path can be started until all previous projects in the dependent path are completed Determining the subordinate path without the subordinate path; And determining an efficient selection of the project to be completed within a sight that maximizes the optimization goal based on the dependent path and limited by budgetary expenditure.
机译:提供本公开的各方面,以在时间,资源和预算约束下有效地将资源分配给时间表中的项目。在一些实施例中,提供了一种方法。该方法包括访问用于确定调度表中的资源的有效分配的变量,该变量包括指示多个项目中的哪个项目应作为完成多个项目中的另一个项目的要求的一组项目相关值。该方法还包括基于项目依赖值的集合来确定表示要完成的项目的顺序的从属路径,其中,可以启动从属路径中的项目,直到完成从属路径中的所有先前项目为止。没有下属的道路;并根据相关路径并受预算支出的限制,确定将要优化的目标最大化的目标的有效选择。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号