首页> 外国专利> Cost optimization of a central energy facility with block-and-index rate structure

Cost optimization of a central energy facility with block-and-index rate structure

机译:分块指数费率结构中央能源设施的成本优化

摘要

A method includes operating equipment to consume energy resources including energy or power purchased from a utility, and obtaining a block-and-index rate profile for a future time period. The block-and-index rate profile includes a block rate and a block size for each of a plurality of sub-periods in the future time period. The block size for a sub-period identifies an amount of energy or power priced at the block rate for the sub-period. The method also includes applying the block-and-index rate profile in an optimization process for the equipment over the time period, running the optimization process, and allocating energy resources to the equipment over the time period in accordance with a result of the optimization process.
机译:一种方法包括操作设备以消耗包括从公用事业公司购买的能量或功率的能量资源,以及获得未来时间段的块和指数速率曲线。块和索引速率简档包括未来时间段中多个子时段中的每一个子时段的块速率和块大小。子周期的块大小标识了按子周期块率定价的能量或功率量。该方法还包括在时间段内对设备的优化过程中应用块和索引速率分布,运行优化过程,并根据优化过程的结果在时间段内将能量资源分配给设备。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号