首页> 外国专利> COST OPTIMIZATION OF A CENTRAL ENERGY FACILITY WITH BLOCK-AND-INDEX RATE STRUCTURE

COST OPTIMIZATION OF A CENTRAL ENERGY FACILITY WITH BLOCK-AND-INDEX RATE STRUCTURE

机译:具有分块和索引率结构的中央能源设施的成本优化

摘要

A building energy system includes equipment operable to consume, store, or generate one or more resources subject to a block-and-index rate structure. The building energy system includes a controller configured to obtain a cost function that represents a block of the resource(s) from the utility provider as being sourced from a first supplier at a fixed rate and a remainder of the resource(s) from the utility provider as being sourced from a second supplier at a variable rate. The controller is configured to optimize the cost function to generate values for one or more decision variables that indicate an amount of resource(s) to purchase, store, generate, or consume at each of a plurality of time steps, and control the equipment to achieve the values of the one or more decision variables at each of the time steps.
机译:建筑能量系统包括可操作以消耗,存储或产生一个或多个资源的设备,该设备服从块索引率结构。该建筑能源系统包括控制器,该控制器被配置为获取成本函数,该成本函数表示以固定费率从第一供应商处获得的,来自公用事业提供者的资源块以及来自公用事业的剩余资源。提供商以可变汇率从第二个供应商处采购。控制器被配置为优化成本函数以生成用于一个或多个决策变量的值,该值指示在多个时间步长中的每一个要购买,存储,生成或消耗的资源量,并控制设备以在每个时间步上获得一个或多个决策变量的值。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号