首页> 外国专利> Railway system, operation control device, operation management method, and operation management program

Railway system, operation control device, operation management method, and operation management program

机译:铁路系统,操作控制设备,操作管理方法和操作管理程序

摘要

The railway system comprises a plurality of trains and an operation control device (10).The operation management device (10) manages the operation of the subject train as the subject train at least one of the plurality of trains.The operation management apparatus (10) comprises a calculating section (24) and a communication section (11).The calculation section (24) calculates the arrival target time of the target train to the next station in the case where a delay of arrival to the next station of the preceding train, which is a train running in front of the subject train, of the plurality of trains has occurred, and when the preceding train arrives at the next station, it calculates the arrival time of the target train to the next station.The communication section (11) transmits the information of the arrival target time calculated by the calculating section (24) to the subject train.
机译:铁路系统包括多个列车和操作控制装置(10)。操作管理设备(10)管理主题系的操作作为所述多个列表中的至少一个。操作管理装置(10 )包括计算部分(24)和通信部分(11)。计算部分(24)在到达前一站的延迟到达下一站的情况下,计算目标训练到下一个站的到达目标时间 火车,即在主题列车前运行的火车,发生了多个列车,当前火车到达下一站时,它计算目标火车到下一个站的到达时间。通信部分 (11)将通过计算部分(24)计算的到达目标时间的信息发送到主题系。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号