首页> 外国专利> Split installation type concrete foundation stone for props and installation method of the foundation stone

Split installation type concrete foundation stone for props and installation method of the foundation stone

机译:基于基础石材的支柱和安装方法分体式安装型混凝土基石

摘要

The present invention relates to a split installation type concrete foundation stone for a post and a method for installing the foundation stone. The base block is first installed in the excavated ground, and then the core block is combined and installed therein to facilitate construction and installation. In order to increase the overall construction efficiency by reducing heavy equipment and construction period because mortar input is unnecessary around the core block and the base block for fixing the block, the ground 2 is dug in the dug space part ( 3) the base block 10 to be seated on the horizontal bottom surface (4) in; The base block 10 is formed by a plurality of side walls 12 formed of concrete, each of which has an outer side 15 and an inner side 13, so that an installation space 19 is formed inside, and the A ring groove 16 for movement of the base block 10 is formed on the outer surface 15 , and is inserted into the installation space 19 of the base block 10 to be seated on the horizontal floor surface 4 . being a core block 30; The core block 30 is inserted into the installation space 19, the inner surface 13 of the base block 10 and the outer surface 32 facing with a spaced portion w of 3 to 10 cm The lower insert 31 is formed so as to be positioned, and a reduced step is formed on the upper portion of the lower insert 31 to be exposed to the ground 2, and a plurality of anchor bolts 37 for fixing the posts 9 ) is formed by the upper installation jaw 36 protruding, and the spaced portion w formed between the inner surface 13 of the base block 10 and the outer surface 32 of the core block 30 is in the space It is characterized in that it is formed by filling with mortar or sand so that the inner surface 13 of the base block 10 and the outer surface 32 of the core block 30 are positioned to be fixed to each other by filling.
机译:本发明涉及一种用于柱的分流安装型混凝土基石及其安装基石的方法。首先将基块安装在挖掘地面,然后将芯块组合并安装在其中,以便于构造和安装。为了通过减少重型设备和施工时期来提高整体施工效率,因为砂浆输入在芯块周围不需要用于固定块的基座,地面2在挖掘空间部分(3)挖出基座10坐在水平底表面(4)上;基座10由由混凝土形成的多个侧壁12形成,每个侧壁12具有外侧15和内侧13,使得安装空间19形成在内,并且环形槽16用于移动基座块10形成在外表面15上,并且插入基座10的安装空间19中以便于水平地板表面4上安装。作为核心块30;将芯块30插入安装空间19中,基座10的内表面13和面向下插入件31的间隔件W的外表面32形成为定位,并且在下部插入件31的上部形成缩小的步骤,以暴露于地2,并且由上安装钳口36突出,并且间隔开的部分形成用于固定柱9的多个锚固螺栓37形成在基座块10的内表面13和芯块30的外表面32之间,其特征在于它通过填充砂浆或砂而形成,使得基座10的内表面13并且芯块30的外表面32定位成通过填充来彼此固定。

著录项

  • 公开/公告号KR102315087B1

    专利类型

  • 公开/公告日2021-10-19

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR1020210048390

  • 发明设计人 이영암;

    申请日2021-04-14

  • 分类号E02D27/42;E02D27/01;

  • 国家 KR

  • 入库时间 2022-08-24 21:45:50

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号