首页>
外国专利>
FULL-DAY TRAIN OPERATION DIAGRAM GENERATING METHOD BASED ON RELATIONSHIP BETWEEN TIME-SHARING PLAN AND ACTIVITY EVENTS
FULL-DAY TRAIN OPERATION DIAGRAM GENERATING METHOD BASED ON RELATIONSHIP BETWEEN TIME-SHARING PLAN AND ACTIVITY EVENTS
展开▼
机译:全日列车操作图生成方法,基于时间共享计划与活动事件的关系
展开▼
页面导航
摘要
著录项
相似文献
摘要
A full-day train operation diagram generating method based on the relationship between a time-sharing plan and activity events, comprising: S1, configuring basic parameters of an operation plan; S2, constructing, for different routing ratios, the quantitative relationship between travel time and departure intervals, and calculating the actual reversing time at each reversing station that can meet the requirements of each routing ratio within a given reversing time range; S3, generating arrival and departure event time points of a train at each station platform of different time periods for different routings, directions, and proportions, correcting start and end time points for each routing for different time periods to achieve transition between time periods; and S4, according to full-time period train arrival and departure event time points obtained by executing step S3 multiple times, connecting section operation and stop activities of trains, matching train set reversing and departing/garaging activities, and correcting track occupation conflict-related arrival and departure time points, so as to obtain a full-day train operation diagram. The beneficial effect is that advantages of standardized routing ratio and automatic high-/low-peak transition are achieved.
展开▼