首页> 外国专利> Rocking bridge with experience facility in both sides and method for constructing this same

Rocking bridge with experience facility in both sides and method for constructing this same

机译:摇滚桥与经验设施的两侧和方法构造相同

摘要

The present invention consists of a pair of left and right having a certain vertical height, and the first and second pylons 11 and 12 and the third and fourth pylons 16 and 17 are installed above the first and second shifts 1 and 2, respectively. ), the first and third support ends 13 and 18 and the second and fourth support ends 14 located on the outside adjacent to each of the first and third pylons 11 and 16 and the second and fourth pylons 12 and 17, respectively. , 19); The first and second main cables 21 and 22 and the first and second main cables 21 and 22 respectively connecting the first and second pylons 11 and 12 and the third and fourth pylons 16 and 17, respectively The first and second hanger cables 23 and 24 that are connected to and extend downward, the support cables 26 and the second ends each of which are fixedly coupled to the first and second shifts 1 and 2, respectively. 1, 2 auxiliary support cables (27, 28); The support cable 26 and the first and second auxiliary support cables 27 and 28, respectively, the support bar 31 disposed on the upper surface, and the first and second handrail posts, each of which the lower end is coupled to the support bar 31 ( 32, 33), the stepping plate 34 fixedly coupled to the upper surface of the support cable 26 between the first and second handrail posts 32, 34, and the lower end of each of the support bars 31 at one end and the other end, respectively. The first and second auxiliary handrail posts (35, 36) coupled to each other and the first and second auxiliary support cables (27, 28) are first and second safety footrests (36, 38) fixedly coupled to the upper surface of each; walking path including Suspension bridges with experience facilities are provided on both sides.
机译:本发明由具有一定垂直高度的一对左右,第一和第二塔架11和12以及第三和第四塔架16和17分别安装在第一和第二换档1和2上方。 ),第一和第三支撑端13和18以及位于与第一和第三塔架11和16中的每一个以及第二和第四塔架12和17相邻的外部的第二和第四支撑端14。 ,19);第一和第二主电缆21和22以及分别连接第一和第二塔架11和12和第三塔架16和第三塔架16和17的第一和第二主电缆21和22,分别是第一和第二吊架电缆23和24连接到并向下延伸,支撑电缆26和第二端分别固定地耦合到第一和第二换档1和2。 1,2辅助支撑电缆(27,28);支撑电缆26和第一和第二辅助支撑电缆27和28分别设置在上表面上的支撑杆31和第一和第二扶手柱,每个下端连接到支撑杆31( 32,33),踩踏板34固定地联接到支撑电缆26的上表面,在第一和第二扶手柱32,34和每个支撑杆31的下端一端,另一端,分别。彼此耦合的第一和第二辅助扶手柱(35,36)是第一和第二安全搁脚板(36,38)固定地连接到每个的第二安全搁脚板(36,38);两侧都提供了悬挂桥的步行路径,包括带经验设施的悬架桥。

著录项

  • 公开/公告号KR102281533B1

    专利类型

  • 公开/公告日2021-07-26

    原文格式PDF

  • 申请/专利权人 (주)신흥이앤지;주식회사 지에스웹;

    申请/专利号KR20210030641

  • 发明设计人 표옥근;

    申请日2021-03-09

  • 分类号E01D11/02;E01D19/14;E01D19/16;E01D21;

  • 国家 KR

  • 入库时间 2022-08-24 20:25:19

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号