首页> 外国专利> Constructing method of rocking bridge supported by lateral cables, and that rocking bridge using this same

Constructing method of rocking bridge supported by lateral cables, and that rocking bridge using this same

机译:构建横向电缆支撑的摇动桥的方法,摇摆桥使用相同

摘要

In the present invention, the first and second handrail coupling portions 31 and 36 are each fixedly coupled to each of the first and second supporting cables 21 and 22 in a state of being spaced apart from each other by a predetermined distance. The first installation step of the first and second railing coupling parts (31, 36); The first support plate 32 of the adjacent first handrail coupling part 31 and the adjacent second handrail coupling part 36 by first installing each of both ends at the lower end of the mold 40 and at the lower end of the other side The first installation step of the mold 40 coupled to each of the second support plate 37; When the mold 40 is first installed, the first and second railing coupling portions 31 and 36 are installed in a state facing each other in the direction of the second pylon 18, spaced apart by a certain distance, and sequentially installed, and then the first, The first and second auxiliary temporary cables (28, 29) connected to the second temporary cables (26, 27) are sequentially moved in the direction of the second pylon (18), and the first and second railings adjacent to each of the molds (40) are combined. A second installation step of the mold 40 sequentially coupled to each of the first and second support plates 32 and 37 of each of the parts 31 and 36; Removing the first and second temporary cables (26, 27) from the first and second pylons (13, 18), respectively; Installation step of the first and second handrail cables 51 and 56 between each of the plurality of first and second support cables 21 and 22; construction method of a sloping bridge supported by a side cable including, and slumping by Provide a leg.
机译:在本发明中,第一和第二扶手连接部分31和36各自固定地连接到第一和第二支撑电缆21和22中的每一个,其在彼此间隔到预定距离的状态下。第一和第二栏杆联接部件(31,36)的第一安装步骤;相邻的第一扶手联接部分31和相邻的第二扶手连接部分36的第一支撑板32通过首先安装在模具40的下端和另一侧的下端的两端中的每一个安装第一安装步骤模具40连接到每个第二支撑板37;当首先安装模具40时,第一和第二栏杆联接部分31和36在第二塔架18的方向上彼此面对的状态安装,通过一定距离间隔开,并顺序安装,然后是第一,连接到第二临时电缆(26,27)的第一和第二辅助临时电缆(28,29)在第二塔(18)的方向上顺序地移动,以及与每个模具相邻的第一和第二栏杆(40)组合。模具40的第二安装步骤顺序地连接到每个部件31和36中的每一个的第一和第二支撑板32和37中的每一个;从第一和第二塔架(13,18)中移除第一和第二临时电缆(26,27);第一和第二扶手电缆51和56的安装步骤在多个第一和第二支撑电缆21和22中的每一个之间;由侧电缆支撑的倾斜桥的施工方法,包括和腿部通过提供腿部坍塌。

著录项

  • 公开/公告号KR102230420B1

    专利类型

  • 公开/公告日2021-03-22

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR1020210008450

  • 发明设计人 표옥근;이준해;

    申请日2021-01-21

  • 分类号E01D21;E01D11/02;E01D19/14;E01D19/16;

  • 国家 KR

  • 入库时间 2022-08-24 17:50:04

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号