A build unit may include a build chamber, at least two datum apertures defined in at least two opposite sides of the build unit, and at least two alignment posts that seat within the datum apertures to couple the lift system to the build chamber, and to align the lift system in a first coordinate direction relative to the build chamber.
展开▼