首页> 外国专利> TBM Optimal Operation System for Rock mass

TBM Optimal Operation System for Rock mass

机译:TBM岩体最优运行系统

摘要

The present invention relates to a TBM optimal operation system for rock and an optimal operation method, and more particularly, a excavation data measuring unit for measuring excavation data in real time when rock excavation through TBM; A ground condition prediction unit for calculating a rock ground condition prediction value based on the excavation data measured by the excavation data measuring unit; A current state display unit that displays the current state value of the TBM; An optimum operation presentation unit for presenting optimum operation data based on the ground condition prediction value, the current condition value, and TBM equipment specification data; And a driving control unit that adjusts a driving factor based on the optimal driving data in which the current state value is expressed.
机译:本发明涉及一种用于岩石的TBM最优操作系统,更具体地说,更具体地,挖掘数据测量单元,用于通过TBM岩石挖掘时实时测量挖掘数据的挖掘数据测量单元;基于通过挖掘数据测量单元测量的挖掘数据计算岩石地条件预测值的地面条件预测单元;显示TBM的当前状态值的电流状态显示单元;一种最佳操作呈现单元,用于基于地面条件预测值,当前条件值和TBM设备规范数据呈现最佳操作数据;和一种驱动控制单元,其基于所示的最佳驱动数据调整驱动因子,其中表示当前状态值。

著录项

  • 公开/公告号KR20210053520A

    专利类型

  • 公开/公告日2021-05-12

    原文格式PDF

  • 申请/专利权人 현대건설주식회사;

    申请/专利号KR1020190139216

  • 发明设计人 김대영;서영호;이세진;강한별;

    申请日2019-11-04

  • 分类号E21D9/10;G05B13/02;

  • 国家 KR

  • 入库时间 2024-06-14 21:34:13

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号