首页> 外国专利> TWO-SIDE SEMICIRCLE ARCH TYPE LEADING PIPE AND STRUCTURE OF NON-EXCAVATION TYPE TUNNEL USING THEREOF AND METHOD OF CONSTRUCTING THEREOF

TWO-SIDE SEMICIRCLE ARCH TYPE LEADING PIPE AND STRUCTURE OF NON-EXCAVATION TYPE TUNNEL USING THEREOF AND METHOD OF CONSTRUCTING THEREOF

机译:双侧半圆形拱式领先管道和非挖掘型隧道的结构及其构造方法

摘要

[Technical field/solution task] The present invention relates to a double-sided half-circle arch lead pipe, a non-cracked tunnel structure using the same, and a construction method thereof.When propulsion of a bit is difficult due to an underground obstacle during excavation of a shield machine of a steel pipe, a problem occurs next to the steel pipe in order to remove the underground obstacle. It is to solve the problem of having to install a new steel pipe in the hole. [Solution] The method of constructing a non-cracked tunnel structure according to the present invention includes the steps of: (a) forming a propulsion base and a reaching base by performing excavation on both sides of the tunnel to be constructed; (b) installing a propulsion frame in the propulsion base, and disposing a double-sided semi-circular arched lead pipe and a leading pipe press-fitting device; (c) Construct the double-sided semi-circle arch-type lead pipe on one or both upper portions of the tunnel to be constructed, and excavate the double-sided semi-circle arch-type lead pipe with the lead pipe press-fitting device while excavating inside the double-sided semi-circle arch-type lead pipe. Pushing the push-in; (d) Drilling device by inserting a T-shaped propulsion connection guide protruding in the longitudinal direction at the top and bottom of the double-sided semicircular arch lead pipe into the T-shaped guide hole of the guide connecting member protruding longitudinally outside the roof steel pipe, respectively. Press-fitting and pushing the roof steel pipe by the pipe propulsion method; And (e) the roof steel pipe is connected to each other along the ceiling wall and the side wall of the tunnel, and a T-shaped propulsion connection guide protruding from the outside of the roof steel pipe in the longitudinal direction is formed protruding from the outside of the other roof steel pipe in the longitudinal direction. It includes; inserting it into the T-shaped guide hole of the guide connecting member and pushing it in through a tube propulsion method using an excavation device. [Benefit] According to the present invention, when it is difficult to propel a bit due to an underground obstacle during excavation of a shield machine of a roof steel pipe, the underground obstacle can be easily removed through the already excavated lead pipe or the roof steel pipe. In addition, by forming the upper end of the tip of the lead pipe as an inclined surface, it is possible to prevent the soil from collapsing and flowing into the inside when soil is laid, and to prevent ground subsidence in the upper part.
机译:[技术领域/解决方案任务]本发明涉及一种双面半圈拱引线管,使用相同的非裂纹隧道结构,以及其构造方法。推进a由于在钢管的屏蔽机的挖掘过程中挖掘机的地下障碍物难以困难,钢管旁边发生问题,以便去除地下障碍物。它是解决必须在孔中安装新的钢管的问题。 [溶液] 根据本发明构造非裂纹隧道结构的方法包括以下步骤:(a)通过在隧道的两侧执行挖掘来形成推进基座和到达基座建造; (b)在推进基座中安装推进框架,并设置双面半圆形拱形引线管和前导管压配合装置; (c)在隧道的一个或两个上部构建双面半圆拱型引线管材,并通过引线压机配件挖掘双面半圆拱式引线管设备在挖掘内部的双面半圆形拱式引线管内。推入推入; (d)通过在双面半圆形拱门引线的顶部和底部的顶部和底部的纵向上突出的T形推进器连接引导件钻孔装置进入导轨连接构件的T形导向孔,纵向沿屋顶横向突出钢管分别。用管推进法压配和推动车顶钢管; (e)屋顶钢管沿着隧道的吊壁和侧壁彼此连接,并且从横向方向上形成从车顶钢管的外侧突出的T形推进装置突出其他屋顶钢管的外侧沿纵向方向。这包括;将其插入引导连接构件的T形引导孔中,并使用挖掘装置将其推入通过管推进方法。 [益处]根据本发明,当由于在屋顶钢管的屏蔽机的挖掘机的挖掘机挖掘过程中难以推动塔而难以推进,可以容易地去除地下障碍物已经挖掘出铅管或车顶钢管。另外,通过将引线管的尖端的上端作为倾斜表面形成,可以在铺设土壤时防止土壤塌陷并流入内部,并防止上部的接地沉降。

著录项

  • 公开/公告号KR102243586B1

    专利类型

  • 公开/公告日2021-04-26

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR1020190078849

  • 发明设计人 윤성민;윤종식;

    申请日2019-07-01

  • 分类号E21D9;E21D11/38;E21D9/06;

  • 国家 KR