首页> 外国专利> WATER SUPPLY SIMULATION METHOD AND TOOL FOR INTERLACED SYSTEM OF RIVER SYSTEM AND CANAL SYSTEM BASED ON GROUNDWATER MODEL

WATER SUPPLY SIMULATION METHOD AND TOOL FOR INTERLACED SYSTEM OF RIVER SYSTEM AND CANAL SYSTEM BASED ON GROUNDWATER MODEL

机译:基于地下水模型的河流系统交错系统供水仿真方法和工具

摘要

A water supply simulation method for interlaced system of river and canal system based on groundwater model, includes: S1. constructing simulated water conveyance channel based on first data, and performing attribute definition on water conveyance channels; S2. acquiring initial seepage, evaporation and discharge; S3. performing reverse water demand calculation; S4. performing sequential water supply simulation; S5. acquiring corresponding water head, obtaining current seepage, evaporation, discharge, head-end water demand and water consumption demand of each water conveyance channel based on water head; S6. judging whether current iteration is converged according to water head, if yes, proceeding to S7, otherwise returning to S3 after update; S7. judging whether there is next time period, if yes, returning to S3 after update, otherwise proceeding to S8; and S8. judging whether there is a next stress period, if yes, returning to S3 after update, otherwise outputting the result obtained in S5, and ending.
机译:基于地下水模型的河流系统隔离系统供水仿真方法,包括:S1。基于第一数据构建模拟水输送信道,对水输送通道进行属性定义; S2。获取初始渗漏,蒸发和放电; S3。进行反向水需求计算; S4。执行顺序供水模拟; S5。基于水头获取相应的水头,获得每个水输送通道的电流渗流,蒸发,放电,头端水需求和耗水需求; S6。判断当前迭代是否根据水头融合,如果是,则进行到S7,否则更新后返回S3; S7。判断是否有下次时段,如果是,更新后返回S3,否则返回到S8;和S8。判断是否存在下一个应力期,如果是,更新后返回S3,否则输出在S5中获得的结果,并结束。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号